Case studies

The joint program of UNIDO and UNEP Cleaner Production was launched in 1994 and proved to be successful on the example of of thousands of enterprises in developing countries and countries transition economies (Slovakia, China, South Africa, Kenya, Tanzania, Peru and many others).

In the section «Publications» you can find some examples of concrete proposals on the organization of resource efficient and cleaner production, implemented in enterprises (foreign experience).

As part of the demonstration program in the Republic of Belarus in 2014-2015 it was assessed resource efficiency and the possibility of the organization of cleaner production.

This section provides brief examples of proposals / technical solutions for the implementation of resource efficient and cleaner production at Belarusian enterprises.

2014

Confectionary factory Kommunarka

Molodechno Milk Factory

Vileisky Bakery Plant

Vileisky Milk Plant

2015

OJSC Olivaria Brewery

JSC Amazon Colorit

JSC Minskzhelezobeton

Constructions Material Plant JSC branch Minskzhelezobeton

Hollow products factory JSC branch Minskzhelezobeton

Molodechno Food Factory

Vileika housing and communal administration (construction unit)

JSC Clovertex

IE Vitella

Road Construction authority №13 JSC DST-5

Road construction authority№195, Molodechno branch Minskobldorstroi

Road construction authority №162, Vileika branch Minskobldorstroi

Case studies

Application of heat recovery from the compressor

Automation of the process of detergent dispensing

Efficient thermal insulation of two steaming chambers

Eliminating steam leakage in the steam pipe and technological equipment

Eliminating steam leakage

Installation of infrared heaters to locally heat work places

Installation of inverters on electric smoke exhausts asphalt mixing machines

Installation of the inverter to the motor exhauster of the asphalt mixing plant

Installation of the wastewater meter

Installing the double consistent rolled gates

Installing the limit switches on the water

Insulation of the tumble dryer

Organization of ventilation with the heat recovery of the hot shop

Replacement of the part of the central heating of the building with the local infra-red heaters

Replacing energy consuming equipment to more energy efficient

Replacing energy consuming equipment with more energy efficient

Replacing fluorescent lamps and incandescent lamps with LED

Replacing fluorescent lamps with LED lighting in the molding shop

The TRC implementation for monitoring and adjusting the temperature of the water used for keg washing

Thermal insulation of steaming chambers.docx

Thermal insulation of the manufacturing equipment with a thin-layer insulation

Usage of rain water for making concrete mix

Use of a two (three) stage mixing of concrete

Use of reusable returnable containers